Projects


Below is a list of church maintenance/upgrade task pull sheets. Each set of tasks has a title followed by an attached PDF list. Feel free to view these online or download them directly to your desktop or device.

 

Remove window air conditioners

Exterior prime upper windows on Sanctuary.

Paint the lower floor west end of the hallway, from the commonly-used entrance door to
the place where the hallway “jogs” towards the Office.

Paint the lower floor meeting room (the one with exterior doors).

Check leak at kitchen wall.

Install new exterior lights outside in front of sanctuary.

Exterior final paint coat on exterior Sanctuary trim.